projects / Gilead Science


Gilead Science, a US based pharmaceutical manufacturer of high potency pharmaceuticals acquired the former Altana tabletting plant in Co. Cork. Thereafter it embarked on a production expansion project consisting of new packaging building, new warehouse building with a link backbone to the existing plant.
 
The new facility consisted of 3,300 sq.m of packaging halls incorporating Grade D classified cleanrooms; warehouse of 2,800 sq.m comprising of high bay narrow aisle racking  and a backbone linking the new facility with the existing buildings.

project gallery


project specifications



Kirby Group was contracted to install all electrical, instrumentation and data communication services. The installation scope may be summarised as follows:

  • MV and LV electrical infrastructure
  • UPS and lightning protection
  • Main board and sub-distribution boards
  • Motor control centres and motor control panels
  • Lighting and emergency lighting
  • General services
  • Fire alarm
  • Life safety systems
  • Voice and data

  • Scope: Electrical and Instrumentation Services
  • Contract Value: € 2.5m
  • Consultant: Jacobs Engineering / DPS / Sisk